PSM for Boilers?

Several large food manufacturing companies have now started implement PSM on their boilers with in the facility for best practices.  GCAP believes that PSM will be a requirement on high/or low fire boilers, fire/water tube, across the US in the Read more

Pressure Gauge Accuracy

Certain instruments used in the refrigeration system are relied on for the information they provide.  These include Thermometers, transducers, and gauges. Control computer actions, system operation changes, and maintenance are often based on these values. With this much depending on Read more

Hot Work Designated Areas?

Hot Work Designated areas? Most facilities we audit have specific areas (usually maintenance shops) designated as areas where Hot Work can be performed without a Hot Work Permit. These areas ARE allowed but there are specific requirements that have to Read more

SOP Training?

Refresher Training and SOPs A recent email we received is all too common: I’m being told we have to train operators on all SOP’s annually along with our annual recertification of all of our SOP’s. I was only aware we Read more