Hot Work Designated Areas?

Hot Work Designated areas? Most facilities we audit have specific areas (usually maintenance shops) designated as areas where Hot Work can be performed without a Hot Work Permit. These areas ARE allowed but there are specific requirements that have to Read more

SOP Training?

Refresher Training and SOPs A recent email we received is all too common: I’m being told we have to train operators on all SOP’s annually along with our annual recertification of all of our SOP’s. I was only aware we Read more

IIAR 2: 3rd Public Review

A third (3rd) public review of draft standard BSR/IIAR 2-201x, Standard for Safe Design of Closed-Circuit Ammonia Refrigeration Systems is now open. The International Institute of Ammonia Refrigeration (IIAR) invites you to make comments on the draft standard. Substantive changes resulting Read more

PSM Opportunity @ GCAP

Do you have a passion for Ammonia Process Safety Management? Do you feel you have more to offer the Ammonia PSM community than you can at your current position? GCAP is looking to expand our compliance team through the addition Read more

Piping and Instrumentation Diagrams (P&IDs)

Piping and Instrumentation Diagrams (P&IDs) P&IDs are used throughout the industry to show the relationships between equipment and instrumentation in the system. They can also show other information to enhance clarity, such as how ammonia flows through the system. P&IDs Read more