For as some time now, there has been many opinions on how to leak test after maintenance on an ammonia refrigeration system. Maintenance that involves opening systems to the atmosphere, must be checked for leaks after tasks are done. IIAR states that pressure testing requirements (ASME B31.5) are different that leak testing requirements. ASME B31.5 states to take to 1.10 the MAWP for a pressure test. It seams like not many people in the industry could agree to any of the following and we applaud IIAR for their interpretation of a leak test.
- Is the component properly evacuated?
- Has the component been properly dehydrated?
- How much exposed pressure is needed?
- How hot/cold to exposed temperature?
- How long to hold at pressure/temperature?
- Appropriate tools used to prove component is leak tight?
IIAR 6, Section 5.5.3 requires that leak tests are to be performed after ITM tasks that require opening the system. A.5.5.3 references IIAR 4 and IIAR 5 for guidance on test and leak pressures. IIAR 5
specifies that leak tests must be performed at “design pressure or a pressure specified in the engineering design” (ASME B 31.5 also indicates this). However, leak testing at design pressure after routine maintenance is impractical. Examples of such routine maintenance activities might include:
• Changing an oil filter(s) or coalescing element(s) on a compressor
• Replacing a strainer basket within a strainer on a valve group
• Replacing an atmospheric relief valve that doesn’t have a 3-way valve
• Replacing a hydrostatic/internal relief valve or a control valve within a valve group
In some cases, leak test pressure at design pressure might be applied to relief valves which would not hold that pressure and is also impractical.
QUESTION 1: Please clarify the appropriate leak test pressures for leak testing after routine maintenance activities that do not involve repair, modification or expansion of the system. Would using the design operating pressure be sufficient to be compliant with “a pressure specified in the engineering design” for such maintenance activities?
ANSWER 1: For parts of the system operating at 15 psig or greater, leak testing should be performed using the highest pressure that the tested portion of the system will experience during a normal operational cycle, which may include defrost cycles, standby (off cycle) or other conditions. For portions of the system that operate at less than 15 psig, the test should be performed at the greater of 15 psig or the highest pressure that the tested part of the system will have during
a normal operational cycle, which may include defrost cycles, standby (off cycle), or other conditions.
QUESTION 2: Please also clarify the time frame required for proving system tightness.
ANSWER 2: The time frame for proving system tightness during leak testing after routine maintenance tasks need not be extensive, but should be sufficient for all mating surfaces (e.g. seals, joints, gaskets and etc.) to be checked using conventional methods (e.g., bubble test, leak detectors, sulfur sticks).
COMMITTEE ACTION: Add informative appendix statements to IIAR 6 indicating that leak testing at the worst-case (highest) operating pressure, but not less than 15 psig, is acceptable for leak testing after ITM tasks that do not involve repair or modification to the system. Indicate an acceptable time frame for proving system tightness during leak testing.